Preliminary Design and Feasibility study
Tram network for Sudan
Deposit Payment
Deposit Payment for Preliminary Design and Feasibility Study – Light Rail and Tram Network

Development of Light Rail Tram Network
- 3 rail lines across the city
- Preliminary Design
- Feasibility Study
- Economic Planning
- Environmental Studies
- Topographic studies
- 33km total
Agreement for the Provision of Consultancy Services for the Development of Khartoum Light Rail Tram Network, Preliminary Design and Feasibility Study
My Registration details
Please enter your contact information;
Thank you, a confirmation email with password will be sent to your address
4.0 Payment via Bank Transfer or Cheque
First Deposit Payment of 4,995 Euro
Remaining to be paid in accordance to Remuneration Schedule
Please make Payments in EUROS (€) to the following bank account :
PAYMENT INFORMATION :

(a) BANK :
QATAR NATIONAL BANK
(b) IBAN :
QA42QNBA 00000000 7330002388003
(c) SWIFT CODE :
QQNB AQA QA XXX
(d) NAME :
KISCONSULT, LTD CO
Advanced Payment via Debit or Credit

Select payment you would like to make :
* Deposit € 4995 First payment
View Contract on Portal
Enter Ministry Portal with Password
Deliverables
Electronic and Hard Versions
1.1 All soft copies of drawings should be in CAD format and in PDF format.
1.2 The Consultant shall provide the Employer with a soft copy of the drawings in GIS compatible format.
1.3 An Electronic version that can be printed on A3 size
1.4 An Electronic version that can be printed at A0 size
2.1 Each submittal shall be in both hard and editable soft copy.
2.2 The draft submittals of any reports including the schematic design report and the close out report should be submitted in 3 colored copies on A3 size.
2.3 The final submittal of any reports including the schematic design report and the close out report should be submitted in 5 colored copies on A3 size and 2 colored copies on A4 size. All shall be with adequate presentable hardcover and editable soft copy.
Outcomes
(a) Feasibility Report
(b) Preliminary Design Drawings
(c) Funding / Donor appraisal-ready documentation for PPP
(d) Recommendation for Implementation
- Proposed Funding Sources : Application to AfDB
- The Consultant shall be responsible for and bear the cost of obtaining the visas and other permits needed by the Consultant’s personnel.
Reliable Guarantee
The Employer shall without charge furnish to the Consultant upon written request the information, data, drawings and documents described below in soft copy format;

(a) Khartoum Master Plan drawing in CAD format
(b) Khartoum topography
(c) Developer Design Guidelines
(d) Feasibility study of line A (1)
(e) Light Rail Tram Design Guidelines
(f) Applicable international codes, standards and data
(g) Applicable local codes
This section clarifies our guarantee policy, highlighting our submittals process designed to ensure your peace of mind and satisfaction.
The Consultant shall be responsible for and bear the cost of obtaining the visas and other permits needed by the Consultant’s personnel.
ENTER PORTAL
Completed payment and registration, enter portal to begin















